Affiliation:
1. Faculty of Science, Department of Mathematics Mansoura University Mansoura Egypt
2. Faculty of Business Administration, Department of Statistics Delta University for Science and Technology Belkas Egypt
Abstract
AbstractThis research aims to develop a multireliability inference method for stress–strength variables based on progressive first failure and an inverse Lomax distribution. This research examines the difficulties associated with estimating the stress–strength reliability function, R, when X, Y, and Z are drawn from three different Inverse Lomax distributions. On the basis of progressive first‐failure censored samples, reliability estimators for multi‐stress–strength Inverse Lomax distributions are estimated using the maximum likelihood, maximum product of spacing, and Bayesian estimation methods. The Bayes estimate of R is obtained using the MCMC method for a symmetric loss function. Monte Carlo simulations and real‐data applications are used to assess and compare the performance of the various suggested estimators.
Subject
Management Science and Operations Research,Safety, Risk, Reliability and Quality
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献