1. IEEE Power System Relaying Committee of the IEEE Power Engineering Society. Power swing and out‐of‐step considerations on transmission line. Report of PSRC WGD62005.
2. Report of the enquiry committee on grid disturbance in northern region on 30th July 2012 and in northern eastern and north‐eastern region on 31st July 2012. Powergrid 2012.
3. Rationale for the use of local and remote (zone 3) protective relaying backup systems—A report on the implications and uses of zone‐3 relays.Report of NERC2005.