1. ADB. (2012)Concept paper: Proposed Multitranche Financing Facility Bangladesh: Irrigation Management Improvement Investment Program Project Number: 45207 Asian Development Bank Manila 2012.https://www.adb.org/projects/45207-001/main
2. ADB RDTA. (2015)Nepal: Innovations for More Food with Less Water Technical Assistance Consultant's Report prepared by Lahmeyer International in association with Lahmeyer International India BETS Consulting Services Centre for Environment and Development and Total Management Service Project Number: 45072–001 Research and Development Technical Assistance (RDTA) March 2015 ADB.https://www.adb.org/sites/default/files/project-documents//45072-001-tacr-01.pdf
3. Baral T. Acharya S.C. Parajuli U.N. Devkota S. Pandey D. Shrestha R.et al. (2022)Management operation and maintenance status and approach: Move ahead for enhancing the performance of irrigation system in Nepal a paper submitted to the 4th world irrigation Forume 16–22 April 2023 Beijing China.
4. DWRI. (2019)Irrigation Management Improvements Report (Annex F) prepared by Tractebel Engineering GmbH in association with NIRAS and TMS for Irrigation Master Plan Preparation through Integrated River Basin Planning under an ADB funded Water Resources Project Preparatory Facility Department of Water Resources and Irrigation (DWRI) Ministry of Energy Water Resources and Irrigation Nepal DWRI July 2019.https://dwri.gov.np/files/document/20210222080845.pdf