1. ACA 2008 PPC2000 The ACA Standard of Contract for Project Partnering, (amended 2008)
2. A concept of corporate planning;Ackoff;Long Range Planning,1970
3. ADAPT 2013 Bridge Design Software with 4D Construction Sequencing and Time-Dependency http://www.adaptsoft.com/specs-abi.php
4. Briefing: design for deconstruction;Addis;Proceedings of the Institution of Civil Engineers,2008