1. Regional Transmission Organizations (RTO)/Independent System Operators (ISO).https://www.ferc.gov/industries‐data/electric/power‐sales‐and‐markets/rtos‐and‐isos(accessed September 2020).
2. The role and implementation of state estimation in an energy management system;Liacco T.D.;International Journal of Electrical Power & Energy Systems,1990
3. Control Center Requirements Manual. NYISO June2019.https://www.nyiso.com/documents/20142/2923231/M‐21‐CCRM‐v4.0‐final.pdf(accessed September 2020).
4. Electrical distribution system state estimation: measurement issues and challenges;Giustina D.D.;IEEE Instrumentation and Measurement Magazine,2014
5. Grid of the future;Ipakchi A.;IEEE Power and Energy Magazine,2009