1. Out of the Crisis. MIT Center for Advanced Engineering Study: Cambridge, MA, 1986; 327–331.
2. , , . Run-to-run control benefits to photolithography. Proceedings of the 9th Sematech AEC/APC Workshop, Incline Village, NV, September 1997.
3. , . Run by run control of chemical-mechanical polishing. Proceedings of the IEEE CPMT International Electronics Manufacturing Technology Symposium, 1995.
4. , , , , . Run-to-run control of a single wafer epitaxial silicon fabrication process. Proceedings of the Sematech AEC/APC Symposium, Incline Village, NV, September 1997.
5. Total Quality, Quality Control and Quality by Design, 1992 (in Hebrew).