1. C.E.Boardman A.E.Dubberley andM.Hui “Optimizing the Size of the S‐PRISM Reactor ”Proc. 8th Int. Conf. Nucl. Engineering ICONE‐8 (2000).
2. C.E.Boardman M.Hui D.G.Carroll andA.E.Dubberley “Economic Assessment of S‐PRISM Including Development and Generating Costs ”Proc. 9th Int. Conf. Nucl. Engineering ICONE‐9 (2001).
3. Boston Consulting Group ”Economic Assessment of Used Nuclear Fuel Management in the United States” (2006).
4. H.I.Bowers L.C.Fuller andM.L.Myers “Cost Estimating Relationships for Nuclear Power Plant Operation and Maintenance ” ORNL/TM‐10563 Oak Ridge National Laboratory (1987).