1. Volume compensation method for routing irrigation canal demand changes;Bautista;Journal of Irrigation and Drainage Engineering,2005
2. China Institute of Water Resources and Hydropower Research (IWHR) 2016 Research and Demonstration of Emergency Control of the Middle Route Project of South-to-North Water Diversion Project in China
3. Clemmens AJ Wahlin BT Shapiro M Dent , P 2016 Unsteady-flow modeling for emergency shutdown of the CAP canal Hydraulic Structures and Water System Management
4. Construction and Administration Bureau of South-to-North Water Diversion Middle Route Project (CABSNWDMRP) 2014 Emergency Response Plan for the Middle Route of South-to-North Water Diversion Project