1. Optimal Generation Planning Considering Uncertainty
2. and , ‘Forecasting load duration curves’, report prepared for the Electricity Corporation of New Zealand Ltd (1990).
3. and , ‘Forecasting load duration curves: Stage 2’, report prepared for the Electricity Corporation of New Zealand Ltd (1991).
4. Bunn, D. (ed.), ‘Approaches to electric load forecasting’, special section in Journal of Forecasting, 6 (1987), 91–156.