Abstract
AbstractThe article first discusses the basic behaviour of a preloaded and non‐preloaded bolted joint subjected to tensile or shear loads. The significance of the preload force for the bolted joint is explained. Causes for the loss of the preload force are described. In order to obtain the most durable bolted joint possible, measures against excessive loss of preload force are presented. Be it through appropriate design or manufacturing recommendations or through the use of additional securing elements. On the one hand, approved securing elements are presented and reference is also made to withdrawn standards and thus nonconforming securing elements.
Subject
General Earth and Planetary Sciences,General Environmental Science
Reference38 articles.
1. DASt‐Richtlinie 024:Anziehen von geschraubten Verbindungen der Abmessungen M12 bis M36 Deutscher Ausschuss für Stahlbau Düsseldorf 2018
2. EN 1993‐1‐9: 2010‐12:Eurocode 3: Design of steel structures ‐ Part 1‐9: Fatigue; German version EN 1993‐1‐9: 2005 + AC: 2009
3. EN 1993‐1‐8: 2010‐12:Eurocode 3: Design of steel structures — Part 1‐8: Design of joints (EN 1993‐1‐8: 2005 + AC: 2009).
4. Vorspannkraftverluste geschraubter Verbindungen infolge beschichteter Kontaktflächen