An automated procedure to determine construction year of roads in forested landscapes using a least‐cost path and a Before‐After Control‐Impact approach

Author:

Valle Denis1ORCID,Rifai Sami W.2,Carrero Gabriel C.34,Meiga Ana Y. Y.5

Affiliation:

1. School of Forest, Fisheries, and Geomatics Sciences University of Florida Gainesville Florida USA

2. School of Biological Sciences University of Adelaide Adelaide South Australia Australia

3. Department of Geography University of Florida Gainesville Florida USA

4. Revalue Nature Ltd London United Kingdom

5. School of Natural Resources and Environment University of Florida Gainesville Florida USA

Abstract

AbstractProximity to roads is one of the main determinants of deforestation in the Amazon basin. Determining the construction year of roads (CYR) is critical to improve the understanding of the drivers of road construction and to enable predictions of the expansion of the road network and its consequent impact on ecosystems. While recent artificial intelligence approaches have been successfully used for road extraction, they have typically relied on high spatial‐resolution imagery, precluding their adoption for the determination of CYR for older roads. In this article, we developed a new approach to automate the process of determining CYR that relies on the approximate position of the current road network and a time‐series of the proportion of exposed soil based on the multidecadal remote sensing imagery from the Landsat program. Starting with these inputs, our methodology relies on the Least Cost Path algorithm to co‐register the road network and on a Before‐After Control‐Impact design to circumvent the inherent image‐to‐image variability in the estimated amount of exposed soil. We demonstrate this approach for a 357 000 km2 area around the Transamazon highway (BR‐230) in the Brazilian Amazon, encompassing 36 240 road segments. The reliability of this approach is assessed by comparing the estimated CYR using our approach to the observed CYR based on a time‐series of Landsat images. This exercise reveals a close correspondence between the estimated and observed CYR (). Finally, we show how these data can be used to assess the effectiveness of protected areas (PAs) in reducing the yearly rate of road construction and thus their vulnerability to future degradation. In particular, we find that integral protection PAs in this region were generally more effective in reducing the expansion of the road network when compared to sustainable use PAs.

Funder

Division of Biological Infrastructure

Publisher

Wiley

Subject

Nature and Landscape Conservation,Computers in Earth Sciences,Ecology,Ecology, Evolution, Behavior and Systematics

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3