Refining the Bank Stability and Toe Erosion Model: Improving the timestep, the top of toe selection and the iteration routine

Author:

Ji Mingyuan1ORCID,Niu Guilin2,You Xueyi1

Affiliation:

1. Tianjin Engineering Center of Urban River Eco‐Purification Technology, School of Environmental Science and Engineering Tianjin University, Beiyang Yuan Campus Tianjin 300350 China

2. Hebei Water Resources and Hydropower Survey Design and Research Institute Group Co., Ltd Tianjin 300250 China

Abstract

AbstractRiverbank failure is an essential source of river sediment and a major cause of river meandering. The Bank Stability and Toe Erosion Model (BSTEM) is a widely used simulation tool owing to its simplicity and clear presentation of results. However, the three core issues in the simulation by the software, time‐step determination, top‐of‐toe (TT) selection, and the iterative algorithm, still lack an in‐depth discussion to ensure the rationality and stability of the simulation results. In this study, the Jing‐150 cross‐section of the Jingjiang River was chosen as an example to illustrate these three problems. For the first problem, which is the choice of the time step, the simulation results become stable and close to the measured value as the time‐step decreases. After determining a suitable time step, the difference between adopting and modifying the default TT of the BSTEM was analysed. The results show that adopting the default TT causes chaos in the distribution of profile nodes, leading to an overly large bank failure width, whereas the modified TT node distribution is normal and the bank failure width is close to the measured value. For the third problem, the original iteration routine (OR) may cause the output bank profile to be unstable and cause a deviation between the bank width and measured value. The negative impact of unstable bank profiles diminishes as the time‐step decreases. However, the workload for reducing the time step is enormous. Therefore, an improved routine (IR) was proposed. With IR, the relative error between the simulated and measured values of the failure width was within 15% when the SD of the water stage was reduced to 0.2478. A similar result could only be obtained when the SD of the water stage was less than 0.099 for OR. This means that to obtain the same simulation accuracy for the failure width, IR can use a larger time step than OR, thereby reducing the workload of the simulation.

Publisher

Wiley

Subject

Water Science and Technology

Reference49 articles.

1. BSTEM‐Team. (2020).BSTEM (Bank Stability and Toe Erosion Model) Model Item. OpenGMS.

2. Investigating effect of water level variation and surface tension crack on riverbank stability

3. Property and influence of reed root on riverbank stability in a typical reach of the Lower Jingjiang Reach;Deng S.;Journal of Sediment Research,2020

4. Ding B.(2018).Model test and numerical analysis of the curved bank failure of the Yangtze in anhui province[Master thesis]. Hefei University of Technology.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3