1. Giffler , B. “SIMPRO I: An IBM 704-7090 Simulation Program for Planning, Scheduling and Monitoring Production Systems,” 1961
2. Giffler , B. “SCHEDULER I: An IBM 7090 Program for Generating, Evaluating, and Improving Schedules,” International Electric Corporation (ITT)
3. “Scheduling General Production Systems Using Schedule Algebra,”;Giffler;Naval Research Logistics Quarterly,1963