1. Bowman M.D.;Piskorowski A.M.(2004)Evaluation and Repair of Wrought Iron and Steel Structures in Indiana. Purdue University West Lafayette Indiana.
2. Sire S.;Douroux J.‐F.(2015)The Electric Arc Welding Reinforcement Of Steel Bridges From The Paris Metro In The 1930s: The Case Of The Austerlitz Viaduct Over The Seine. In: Proceedings of the Fifth International Congress on Construction History (ICCH). Construction History Society of America Chicago Illinois pp.345–354.
3. Cremona C.;Patron A.;Johansson B.et al. (2007)Improved Assessment Methods for Static and Fatigue Resistance of Old Steel Railway Bridges – Sustainable Bridges. Background Document Final Draft. European Commission.
4. Kühn B.;Lukić M.;Nussbaumer A.et al. (2008)Assessment of Existing Steel Structures: Recommendations for Estimation of Remaining Fatigue Life – Background documents in support to the implementation harmonization and further development of the Eurocodes. JRC European Commission.
5. Altstahlschweißen und Nieten im Zuge der Grunderneuerung des “Eisernen Steges” in Frankfurt am Main;Möll R.;Stahlbau,1997