Author:
Lewandowski Jakub,Młynarski Stanisław,Pilch Robert,Smolnik Maksymilian,Szybka Jan,Wiązania Grzegorz
Abstract
The aim of the work was to develop a method of verification of the preventive renewal strategies, which enables a simulation evaluation of the effects of the application of a specific schedule of inspections of parts that are important in the operation of complex renewable technical objects. Using it requires having an already established schedule of inspections, and the result of applying the method is determined by indicators that assess the usefulness of the strategy, even before implementation. The developed computational tool was used to evaluate the renewal strategy of the current collector contact plates. Based on the real operational data, several renewal intervals were considered, determining the frequency of events involving the plate covering a specific mileage, from exceeding the wear control limit value to the next inspection (replacement). The proposed verification method is an important tool for testing and planning technical inspections for systems and elements with planned wear, and parts are periodically replaced.
Publisher
Polskie Naukowo-Techniczne Towarzystwo Eksploatacyjne
Subject
Industrial and Manufacturing Engineering,Safety, Risk, Reliability and Quality
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献