Sweet Corn Growth and Yield Responses to Planting Dates of the North Central United States

Author:

Williams Martin M.

Abstract

Sweet corn is planted over a 3-month period in the north central United States to extend availability for fresh market and processing; however, the extent to which development and growth of sweet corn changes during this period is unreported. Field experiments were conducted in 2006 and 2007 to determine the effect of five planting dates, ranging from mid-April to early July, on sweet corn establishment, growth, and yield components. Day length at the time of silking decreased from 15.1 h in the mid-April planting to 13.7 h in the early July planting. Development took 13 to 25 fewer days from emergence to silking for the hybrid ‘BC0805’, an 82-day augmented sugar enhancer endosperm type, as planting was delayed from mid-April to early July. Maximum height generally increased through planting dates with as much as 23% taller plants in early July versus mid-April planted sweet corn. While leaf mass was unaffected by planting date, maximum leaf number and rate of leaf appearance steadily decreased with later planting dates. Lower reproductive and total biomass at silking as well as marketable ear yield components were lowest in the early July planting date and were associated with presence of maize dwarf mosaic virus in leaf samples. In response to environmental conditions, the crop canopy undergoes distinct morphological changes as planting is delayed, and those changes may have implications for crop production.

Publisher

American Society for Horticultural Science

Subject

Horticulture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3