Planting Date and Cultivar Affect Melon Quality and Productivity

Author:

Dufault Robert J.,Korkmaz Ahmet,Ward Brian K.,Hassell Richard L.

Abstract

Extending the production season of melons (Cucumis melo L.) by using very early and late planting dates outside the range that is commercially recommended will increase the likelihood of developing a stronger melon industry in South Carolina. The objective of this study was to determine if early (February) transplanted melons or later (June through July) planting dates are effective in extending the production season of acceptable yields with good internal quality of the melon cultivars: Athena, Eclipse, and Sugar Bowl and Tesoro Dulce (a honeydew melon). Melons were transplanted in Charleston, S.C., in 1998, 1999, and 2000 on 12 and 26 Feb., 12 and 26 Mar., 9 and 23 Apr., 7 and 21 May, 4 and 18 June, and 2 July and required 130, 113, 105, 88, 79, 70, 64, 60, 60, 59, and 56 days from field transplanting to reach mean melon harvest date, respectively. Stands were reduced 67%, 41%, and 22% in the 12 and 26 Feb. and 12 Mar. planting dates, respectively, in contrast to the 26 Mar. planting date but ≤15% in all other planting dates. Planting in February had no earliness advantage because the 12 and 26 Feb. and 12 and 26 Mar. planting dates, all reached mean melon harvest from 19 to 23 June. Comparing the marketable number of melons produced per plot (averaged over cultivar) of the standard planting dates of 12 and 26 Mar. indicated decreases of 21%, 32%, 36%, 36%, 57%, 57%, and 54%, respectively with the planting dates of 9 and 23 Apr., 7 and 21 May, 4 and 18 June, and 2 July. The most productive cultivar of all was `Eclipse', which yielded significantly more melons per plot in all 11 planting dates followed by `Athena' (in 8 of 11 planting dates), `Tesoro Dulce' (7 of 11 planting dates), and `Sugar Bowl' (2 of 11 planting dates). In our study, any planting date with melon quality less than the USDA standard of “good internal quality” or better (Brix ≥9.0) was considered unacceptable because of potential market rejection. Therefore, the earliest recommended planting date with acceptable yield and “good internal quality” was 12 Mar. for all cultivars; the latest planting dates for `Athena', `Eclipse', `Tesoro Dulce', and `Sugar Bowl' were 4 June, 18 June, 7 May, and 9 Apr., respectively. With these recommendations, the harvest season of melons lasted 40 days from 24 June to 3 Aug. for these four cultivars, which extended the production season an additional 2 weeks longer than the harvest date of last recommended 21 May planting date.

Publisher

American Society for Horticultural Science

Subject

Horticulture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3