Abstract
Abstract
The development of sandstone-type geothermal energy is an important part of the development of geothermal resources and has great significance in promoting environmental protection and energy structural transformation. In sandstone geothermal energy development, recharging is the main method to ensure bottom hole pressure. However, the pressure and temperature changes of sandstone reservoirs under recharge conditions have not been extensively studied. It is easy to ignore the hydraulic relationship between the production and the injection wells, which leads to an increased risk of thermal breakthrough. Therefore, a three-dimensional hydrothermal coupling model is established, and simulation studies of different flow rates, well lengths, and well spacings are completed in this paper. Here, we show the numerical simulation results. The low temperature expansion zone and hydrostatic pressure near the injection well increase with increasing flow rate, and the maximum expansion of the low temperature zone is about 350 m. The low temperature expansion area near the injection well has a small relationship with the well spacing, and the increase in hydrostatic pressure is proportional to the well spacing. As the length of the well increases, the increase in hydrostatic pressure near the injection well decreases, indicating that the injected water under the long well section easily enters the reservoir. When no thermal breakthrough occurs and the hydrostatic pressure drops significantly near the production well, it is recommended that the flow rate be controlled at approximately 20–25 L/s, the well spacing should be 600–800 m, and the well length should be greater than 100 m.
Funder
Jilin Provincial Department of Education
Jilin Province Science and Technology Development Project
Jilin Provincial School Joint Construction Project
National Key R&D Program of China
Cited by
2 articles.