Prediction of Overburden Failure on the Working Face Using Self-Formed Roadway Mining Technology without Coal Pillars Based on Microseismic Monitoring: A Case Study

Author:

Hu Bosheng123ORCID,Wang Tong12ORCID,Xie Panshi12,Luo Shenghu2

Affiliation:

1. School of Energy and Mining Engineering, Xi’an University of Science and Technology 1 , Xi’an, 710054 , China

2. Key Laboratory of Western Mines and Hazard Prevention, Ministry of Education of China 2 , Xi’an, 710054 , China

3. Safty Science and Engineering, Xi’an University of Science and Technology 3 , Xi’an, 710054 , China

Abstract

Abstract In this study, the No.S1201-II working face of a coal mine using self-formed roadway mining technology without coal pillars was used as the engineering background, and physical experiments, numerical simulations, and field measurements were employed to study the spatiotemporal evolution laws of overburden fracture and obtain the periodic breaking law of the overburden. The results revealed the following: (1) the working face length increased after roof cutting, which led to an increase in the roadway stress on the side away from the mined area. The roof displacement remained essentially unchanged when the roadway was in the digging and cutting stages. However, the roof displacement continued to increase during the sinking and forming stages. (2) The height of the fall zone before roof cutting was approximately 17.1–19.4 m, which was 4.3–4.8 times the mining height. The maximum heights of the fracture zone on both sides and in the middle of the working face were 103.6–106.4 m and 92.4–96.1 m, respectively, corresponding to 25.9–26.6 and 23.1–24.0 times the mining height, respectively. The height of the fall zone after roof cutting was approximately 18.1 m, which was 4.5 times the mining height. The maximum heights of the fracture zone on both sides and in the middle of the working face were 100.6–105.2 m and 91.3–95.2 m, respectively, corresponding to 25.1–26.3 and 22.8–23.8 times the mining height, respectively. (3) Combined with the ground pressure behaviors and overburden breakage monitored in the field, the fracture budding phase, fracture development phase, and fracture maturation phase were divided according to the characteristics of microseismic events. A criterion for overburden deformation damage based on microseismic energy was proposed. This study provides a reference for the establishment of a microseismic-monitoring system and the application of this technology.

Publisher

GeoScienceWorld

Reference29 articles.

1. “Study of a no-pillar mining technique with automatically formed gob-side entry retaining for longwall mining in coal mines,”;Wang;International Journal of Rock Mechanics and Mining Sciences,2018

2. “Theory of longwall mining by using roof cuting shortwall team and 110 method—the third mining science and technology reform,”;He;Coal Science & Technology Magazine,2017

3. “Meso- and macroeffects of roof split blasting on the stability of gateroad surroundings in an innovative nonpillar mining method,”;Gao;Tunnelling and Underground Space Technology,2019

4. “Design principles and key technologies of gob side entry retaining by roof pre-fracturing,”;Yang;Tunnelling and Underground Space Technology,2019

5. “Stability study on naturally filling body in gob-side entry retaining,”;Zhou;International Journal of Mining Science and Technology,2012

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3