Evaluating the Impact of Disputes on Time and Cost of Projects

Author:

Mishra A. K.1,Aithal P. S.2

Affiliation:

1. D.Sc. Research Scholar, Srinivas University, India, and Associate Professor, Madan Bhandari Memorial College, Tribhuvan University, Kathmandu, Nepa

2. Professor, Institute of Management & Commerce, Srinivas University, Mangalore, India

Abstract

Purpose: Noise of impacts exists and it is essential to assure the significance factors. The study evaluates the impact of disputes on time and cost of road projects. Design/Methodology/Approach: Based on Extension of earlier research 45 factors were identified using Literature Review and Case study followed by Questionnaire, Key Informant Interview. The Test Hypothesis for Significant impact was done using F-test. Findings/Result: Complete time lost during the interaction would be about 37 years and a half year till date. Normal time lost 4 years and 8 months and 7 days for each undertaking. The debates, which have not been addressed, couldn't be surveyed. The aggregate sum spent on ADR just, for eight undertakings was 38 needs and 5 thousand, on the normal expense for a solitary venture was 4 lakhs and 76 thousand. In any case, the all-out cost caused couldn't be assessed until the debates have been totally settled. This cost included just Settlement/referees or the two charges different costs, for example, opportunity misfortunes and guaranteed cost are excluded. The serious issue that emerges because of debates is time invaded and cost overwhelm. Originality/Value: The professionals assumed to get insights to create zero dispute projects based on real time cases. Paper Type: Research paper

Publisher

Srinivas University

Subject

General Medicine

Reference26 articles.

1. Mishra, A. K., Magar B. R. (2017). Implement the ability of the municipal transport master plan of Bandipur Inner Ring Road, Tanahun, Nepal. International Journal of Scientific & Technology Research, 6(8), 306-313.

2. Mishra, A. K., & Aithal, P. S., (2022). Planning Assessment of Transport System: A Case from Nepal. International Journal of Applied Engineering and Management Letters (IJAEML), 6(1), 280-300.

3. Mishra, A. K., & Aithal, P. S. (2022). Effectiveness of Arbitration in Construction Projects. International Journal of Management, Technology and Social Sciences (IJMTS), 7(1), 96-111.

4. Mishra, A. K., Mandal, L., & Pant, R. R. (2018). Causes of dispute in international competitive bidding road contracts funded by Asian Development Bank in Nepal. J. Adv. Res. Busi. Law Technol. Manage, 1(3), 5-16.

5. Mishra A. K. Project management: theory and practice from different countries. Project management: theory and practice from different countries. Tamilnadu: D K International Research Foundation. 2020.

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Analysis of Conflict-Oriented Circumstances in the Social History of the Vedic Period: A Sociological Perspective;International Journal of Philosophy and Languages (IJPL);2024-08-07

2. Procurement Methods and Practices in Municipality Projects -An Analysis from Mandandeupur, Nepal;International Journal of Management, Technology, and Social Sciences;2024-04-26

3. Association Between Delay, Project Size and Low Bid Percentage;International Journal of Applied Engineering and Management Letters;2023-06-30

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3