Analysis of Price Adjustment Payments for RCC T-Beam and Pre-stressed Bridges Construction Contracts

Author:

Chaudhary Navneet1,Mishra A. K.2,Aithal P. S.3

Affiliation:

1. M.Sc Research Scholar, Madan Bhandari Memorial Academy Nepal, Joint Constituent College of Pokhara University, Urlabari-3, Morang , Nepal

2. D.Sc Research Scholar, Srinivas University, India, and Associate Professor, Madan Bhandari Memorial College, Tribhuvan University, Kathmandu, Nepal

3. Professor, Institute of Management & Commerce, Srinivas University, Mangalore, India

Abstract

Purpose: Let’s compare and analyze the price adjustment payments for RCC T-beam and Pre-stressed bridges construction contracts for evaluation of the cost effectiveness of price adjustment payment. Design/Methodology/Approach: Based on Questionnaire survey and Official documents, comparison and analysis were done for RCC T-beam and Pre-stressed bridges construction contracts of price adjustment payment. Findings/Result: The weightage of price adjustment payment is 9% of total payment. This assessment was done to show the importance of price adjustment and its study in bridge construction contracts. As per GCC & SCC clause 53.7 of Standard Bidding Document, price adjustment is limited to 25%. Comparison of payments for price adjustments was done for different T-girder and pre-stressed bridges. Price adjustment payments for the computed price adjustment coefficients were calculated and compared with that of the actual payment made. Originality/Value: This research was mainly dedicated to deriving logical price adjustment coefficient ranges in making the price adjustment process for RCC T-girder and prestressed construction contracts economical. Paper Type: Research paper

Publisher

Srinivas University

Subject

General Medicine

Reference27 articles.

1. Mishra, A. K., & Aithal, P. S., (2021). Foreign Aid Movements in Nepal. International Journal of Management, Technology, and Social Sciences (IJMTS), 6(1), 142-161.

2. Mishra, A. K., & Aithal P. S., (2021). Foreign Aid Contribution for the Development of Nepal. International Journal of Management, Technology, and Social Sciences (IJMTS), 6(1), 162-169.

3. Mishra A. K. (2020). Project management: theory and practice from different countries. Project management: theory and practice from different countries. Tamilnadu: DK International Research Foundation.

4. Baral, S. (2009, December 23). Nepalese Construction Industry: Challenges & Opportunities. Retrieved from http://www.santoshbaral.blogspot.com

5. Qadeer, Z., Memon, A. H., Leghari, M. A; Memon, N. A. & Siddiqui, F. H, (2019). Identification of Critical Factors Influencing Cost Escalation in Public Sector Construction Projects. Conference: 2nd Pak- Turk International Conference on Emerging Technologies in the Field of Sciences & Engineering, GIK Institute, Pakistan, 11-13.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3