Publisher
Vilnius Gediminas Technical University
Reference89 articles.
1. Ahlemann, F., El Arbi, F., Kaiser, M. G., & Heck, A. (2013). A process framework for theoretically grounded prescriptive research in the project management field. International Journal of Project Management, 31(1), 43-56. https://doi.org/10.1016/J.IJPROMAN.2012.03.008
2. Akinci, B., Fischer, M., & Kunz, J. (2002). Automated Generation of Work Spaces Required by Construction Activities. Journal of Construction Engineering and Management, 128(4), 306-315. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(306)
3. Al-Hussein, M., Alkass, S., & Moselhi, O. (2001). An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(2), 91-105. https://doi.org/10.1108/14714170110814532/FULL/XML
4. Alavidehkordi, S., Emilia Rautio, S., Stancu, M.-A., Stancu Tutor, M.-A., & Pocek, J. (2021). Investing in green building - how sustainability factors influence investment decisions in the European real estate market. International Management & Marketing Management.
5. Amiri, R., Sardroud, J. M., & Soto, B. G. De. (2017). BIM-based Applications of Metaheuristic Algorithms to Support the Decision-making Process: Uses in the Planning of Construction Site Layout. Procedia Engineering, 196, 558-564. https://doi.org/10.1016/j.proeng.2017.08.030