Numerical Simulation of Flood Control Levee Deformation by Shield Tunnel Excavation through the Liuyang River: A Case Study

Author:

Lin Qibin12ORCID,Cao Ping2,Dong Tao234ORCID,Liu Jingshuo5,Zhao Qingxiong2,Zhu Wenbo34

Affiliation:

1. School of Resources Environment and Safety Engineering, University of South China, Hengyang 421001, China

2. School of Resources and Safety Engineering, Central South University, Changsha 410083, China

3. Key Laboratory of Concrete and Prestressed Concrete Structures of Ministry of Education, Southeast University, Nanjing 211189, China

4. School of Civil Engineering, Southeast University, Nanjing 211189, China

5. Department of Hydraulic Engineering, Hunan Polytechnic of Water Resources and Electric Power, Changsha 410131, China

Abstract

The interval section of the Liuyang River flood control levee project of the Changsha Metro Line 6 is used as the engineering background of this study. A three-dimensional finite element numerical model of a tunnel shield containing complex interfaces is established by using the multifield coupling software COMSOL. The paper studied the deformation of flood control levees under shield tunnel excavation working conditions. The results show that when the left line shield machine is excavated below the Liuyang River flood control levee, the deformation of the flood control levee and the surrounding rock of the tunnel is biased towards the built right line tunnel. And it has an impact on the bridge pile near the tunnel. When the shield of the left line crosses the flood control levee, it can easily cause a large deformation and displacement of the levee above the area between the two shields. To ensure the controlled deformation of the levee, the construction should ensure the spacing between the two tunnel palm faces as far as possible and should be far away from other structures on the levee. When the shield crosses the levee, the deformation that occurs at the base of the levee is significantly higher than the deformations that occur at other locations of the levee. Displacement monitoring and secondary reinforcement at the base of the flood control levee appear to be necessary. The numerical simulation results validate the feasibility of using the multifield coupling software COMSOL to study the construction modeling of shield tunnels through rivers and its advantages. This method provides a practical framework for similar tunnel performance engineering or displacement monitoring in future projects.

Funder

Water Conservancy Science and Technology Major Project of Hunan Province

Publisher

Hindawi Limited

Subject

General Earth and Planetary Sciences

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370