Network Traffic Statistics Method for Resource-Constrained Industrial Project Group Scheduling under Big Data

Author:

Huo Zongjie1,Zhu Wei2ORCID,Pei Pei1

Affiliation:

1. School of Economics and Management, Lanzhou University of Technology, Lanzhou, 730050 Gansu, China

2. School of Economics, Lanzhou University, Lanzhou, 730000 Gansu, China

Abstract

With the advent of the Internet era, the demand for network in various fields is growing, and network applications are increasingly rich, which brings new challenges to network traffic statistics. How to carry out network traffic statistics efficiently and accurately has become the focus of research. Although the current research results are many, they are not very ideal. Based on the era background of big data and machine learning algorithm, this paper uses the ant colony algorithm to solve the typical resource-constrained project scheduling problem and finds the optimal solution of network traffic resource allocation problem. Firstly, the objective function and mathematical model of the resource-constrained project scheduling problem are established, and the ant colony algorithm is used for optimization. Then, the project scheduling problem in PSPLIB is introduced, which contains 10 tasks and 1 renewable resource. The mathematical model and ant colony algorithm are used to solve the resource-constrained project scheduling problem. Finally, the data quantity and frequency of a PCU with a busy hour IP of 112.58.14.66 are analyzed and counted. The experimental results show that the algorithm can get the unique optimal solution after the 94th generation, which shows that the parameters set in the solution method are appropriate and the optimal solution can be obtained. The schedule of each task in the optimal scheduling scheme is very compact and reasonable. The peak time of network traffic is usually between 9 : 00 and 19 : 00-21 : 00. We can reasonably schedule the network resources according to these time periods. Therefore, the network traffic statistics method based on the solution of resource constrained industrial project group scheduling problem under big data can effectively carry out network traffic statistics and trend analysis.

Funder

The Natural Science Foundation of Gansu Province, China

Publisher

Hindawi Limited

Subject

Electrical and Electronic Engineering,Computer Networks and Communications,Information Systems

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3