1. School of Civil Engineering, Southwest Jiaotong University, Chengdu, Sichuan 610031, China
2. Business School, Sichuan University, Chengdu, Sichuan 610031, China
3. School of Information and Engineering, Sichuan Tourism University, Chengdu, Sichuan 610031, China
Abstract
In order to effectively control the cost risk of power grid construction projects, the author proposes a cost risk management system for power grid construction projects based on the fuzzy clustering algorithm. The system introduces the fuzzy clustering maximum tree algorithm, and by constructing a mathematical model, combined with the empirical analysis, the key risk factors in the cost risk of power grid construction projects are identified. Through the analysis, it can be concluded that the key risks in the cost risk of power grid construction projects are the planning risks of infrastructure projects, the research risks of infrastructure projects, and the cost risks of infrastructure projects. Experimental results show that combined with expert experience and the actual situation of power grid engineering, the classification result at threshold
becomes more realistic. At this
level, 6 risk factors are grouped into 4 categories as follows: class I
, class II
, class III
, and class IV
. Through research, the identification of key risks can enable project managers to control the cost of power grid construction projects, targeted, so that risks can be minimized and investment returns can be improved.
Funder
National Natural Science Foundation of China
Subject
Electrical and Electronic Engineering,Computer Science Applications,Modeling and Simulation
Reference22 articles.
1. Construction of risk evaluation index system for power grid engineering cost by applying wbs-rbs and membership degree methods;J. Wang;Mathematical Problems in Engineering,2020
2. Knowledge graph construction and application of power grid equipment;H. Huang;Mathematical Problems in Engineering,2020
3. Construction of energy minimized WSN using GA-SAMP-MWPSO and K-mean clustering algorithm with LDCF deployment strategy
4. Survivability optimisation of communication network for demand response in source–grid–load system
5. A planning method of substation considering main transformer adjustment utilization and safety efficiency cost;N. Yang;Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering,2020
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献