Research on the Technology of Plugging Gushing Water in the Vertical Shaft under Complicated Conditions

Author:

Jia Chuanyang12ORCID,Wang Hailong12,Liu Haiquan3,Zhang Guibin12,Sheng Kaihua4

Affiliation:

1. School of Architecture, Linyi University, Linyi 276000, China

2. Linyi City Key Lab of Appraisement and Strengthening in Building Structures, Linyi 276000, China

3. Baodian Coal Mine, Yanzhou Coal Mining Company Limited, Yanzhou 273513, China

4. State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province and the Ministry of Science and Technology, Qingdao 266590, China

Abstract

The shaft is the throat of the mine construction, and it is easily disturbed by gushing water, which affects the mine construction progress. Aiming at technical problems under complex hydrogeological conditions in coal mines, such as vertical shaft lining rupture and serious gushing water, single-liquid and double-liquid cement grouting materials are invalid for multiple plugging of gushing water. Combining with geological data to analyze the conditions of the aquifers and water-blocking layer in the shaft, adopting the multifunctional digital electrical method and digital flow measuring instrument can accurately grasp the flow direction and flow velocity and further obtain the aquifer parameters of the main and auxiliary shafts. At the same time, based on the FLAC numerical simulation software, research on the stress, displacement, and plastic failure of the shaft surrounding rock under different water pressures (0.5 times, 1 time, and 2 times the hydrostatic pressure) and comparative analysis of the influence of the water bodies on the shaft surrounding rock are carried out. On this basis, the following are the objectives: (1) research the mechanical properties of polymer chemical material Malisan N and the mechanism of grouting to plugging gushing water and strengthening surrounding rock, (2) formulate the grouting drilling layout and construction technology for the topsoil and bedrock section of the main and auxiliary shafts, and (3) carry out long-term monitoring of the water inflow. The monitoring data showed that the measured water inflow was less than 0.05 m3/h after the grouting of the shaft surrounding rock, which achieved the purpose of preventing the shaft linings from rupturing, plugging the gushing water, and stabilizing the aquifer water pressure.

Funder

Natural Science Foundation of Shandong Province

Publisher

Hindawi Limited

Subject

General Earth and Planetary Sciences

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3