A TOPSIS-Based Decision Model to Establish Priorities for Sequencing the Design of Construction Projects in the Public Sector

Author:

Nascimento C. R. S. M. S.1ORCID,de Almeida-Filho A. T.1ORCID,Palha R. P.1ORCID

Affiliation:

1. Universidade Federal de Pernambuco, Recife, Brazil

Abstract

The availability of resources regarding budget and personnel for infrastructure development in the public sector is increasingly scarce, prioritizing personnel payments and basic expenses. Therefore, there is a need to prioritize the design of maintenance, refurbishment, and construction projects. Also, it is necessary to validate their impact and necessity before allocating public resources. The main contribution of this paper is a framework proposed to handle these issues frequently found in the public sector with a multicriteria approach, considering strategic and service aspects. To illustrate the proposed model, we considered the context of a federal institution of higher education that offers an infrastructure for about forty thousand students. This public institution is affected by issues of conjuncture and opportunities arising from political moments that hinder consistent programming for better allocation of these resources. Similarly to other institutions in the public sector, the chosen one has to cope with several demands for construction projects. However, limited resources and personnel to carry out those project designs are subject to the uncertainty of not having the financial resources to implement these construction projects. Or even worse, when unforeseen, funds to carry out specific projects arise without a feasible time to design those construction projects that the public institution did not prioritize. Thus, another contribution of the decision model proposed in this paper is to enable the department responsible for projects to establish the ranking for the project design, considering the multiple criteria that reflect the institution’s needs. Among the advantages perceived from this real application, there is a priority ranking resulting from a mathematical model based on the TOPSIS method, which is easy to understand. Furthermore, the proposed approach gives the transparency and reproducibility required in such a public and democratic environment, enabling transparency on the criteria considered in the allocation process for all personnel involved considering the actors that manage the resources and those which demand the project design services.

Funder

Fundação de Amparo à Ciência e Tecnologia do Estado de Pernambuco

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A TOPSIS-based framework for construction projects’ portfolio selection in the public sector;Engineering, Construction and Architectural Management;2023-12-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3