Affiliation:
1. Reactor Engineering Division, Jožef Stefan Institute, Jamova cesta 39, 1000 Ljubljana, Slovenia
Abstract
Measured plant data from various abnormal events are of great importance for code validation. The purpose of the study was to validate the RELAP5/MOD3.3 Patch 03 computer code with the abnormal event which occurred at Krško Nuclear Power Plant (NPP) on April 10, 2005. The event analyzed was a malfunction, which occurred during a power reduction sequence when regular periodic testing of the turbine valves was performed. Unexpected turbine valve closing caused safety injection signal, followed by reactor trip. The RELAP5 input model delivered by Krško NPP was used. In short term, the calculation agrees very well with the plant measured data. In the long term, this is also true when operator actions and special plant systems are modeled. In the opposite, the transient would progress quite differently. Finally, the calculated data may be supplemental to plant measured data when the information is missing or the measurement is questionable.
Funder
Slovenian Nuclear Safety Administration
Subject
Nuclear Energy and Engineering
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献