Affiliation:
1. School of Mechanical and Precision Instrument Engineering, Xi’an University of Technology, Xi’an, Shanxi 710048, China
Abstract
Integrated Process Planning and Scheduling (IPPS) problem is an important issue in production scheduling. Actually, there exit many factors affecting scheduling results. Many types of workpieces are commonly manufactured in batch production. Moreover, due to differences among process methods, all processes of a workpiece may not be performed in the same workshop or even in the same factory. For making IPPS problem more in line with practical manufacturing, this paper addresses an IPPS problem with batches and limited vehicles (BV-IPPS). An equal batch splitting strategy is adopted. A model for BV-IPPS problem is established. Makespan is the objective to be minimized. For solving the complex problem, a particle swarm optimization (PSO) with a multilayer encoding structure is proposed. Each module of the algorithm is designed. Finally, case studies have been conducted to validate the model and algorithm.
Funder
Xi'an University of Technology
Subject
General Engineering,General Mathematics
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献