Analysis and Prediction of the Factors Influencing Postconstruction Surface Deformation of Pipe-Jacking Tunnel in Soft Clay Strata in China

Author:

Cui Guo-jing123ORCID,Xie Jiang-sheng4,Sun Yin-hao5,Gao Yong-ji5

Affiliation:

1. School of Civil Engineering, Xi’an University of Architecture and Technology, Xi’an 710055, China

2. Shaanxi Provincial Key Laboratory of Geotechnical and Underground Space Engineering, Xi’an 710055, China

3. Shaanxi Construction Investment Group Co, Ltd., Xi’an 710016, China

4. China Railway 20th Bureau Group Corporation Limited, Xi’an 710016, China

5. No. 1 Engineering Corporation Limited of CR20G, Suzhou 215151, China

Abstract

During the postconstruction operation period, the engineering structure and operation safety of a pipe-jacking tunnel are more likely to be threatened by the surrounding environment and groundwater when it is located in a soft clay stratum. Surface settlement data related to the construction of 24 rectangular pipe-jacking tunnels in a soft clay stratum in China were collected and analyzed to determine the effect of pipe-jacking tunnel engineering on its deformation based on factors such as structural section form, geotechnical condition, groundwater condition, and buried depth. The postmaximum surface settlement and postformation loss rate were obtained, the correlation coefficients between the postsurface deformation of soft clay strata and various influencing factors were calculated using a software for correlation analysis, and the variation rules for each influencing factor were explored in depth. Subsequently, multiple linear regression methods were used to predict the maximum surface deformation of the pipe-jacking tunnel project in soft clay strata during the postoperation period, and actual engineering cases were verified and analyzed. The results show that the relative buried depth of the pipe-jacking tunnel in soft clay stratum has the greatest influence on the postmaximum ground settlement, followed by the section area of the pipe-jacking tunnel, and the relative height coefficient of groundwater level has the least influence. Under the reduction coefficient of 0.937 − 0.846, a new prediction formula for surface settlement deformation after the construction of the soft clay layer was derived. The error between the formula and the measured data was 9.05%, which can be used as a reference for controlling design parameters to predict the settlement after construction of pipe-jacking engineering.

Funder

Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference58 articles.

1. Prediction and analysis of long-term settlement of large section Rectangular combined pipe jacking underground excavation station in soft soil;Y. Yang;Tunnel Construction,2019

2. Analysis of influence factors on settlement and deformation of transition section of road-bridge of Qinghai-Tibet Railway;F. Niu;Rock and Soil Mechanics,2011

3. Research status and prospect of deep and shallow buried boundary of loess tunnel;Z. Song;Disaster Prevention and Control of Tunnel and Underground Engineering,2021

4. Research on long-term settlement of shield tunnel and soil layer caused by subway load;D. Zhang;Journal of Disaster Prevention and Mitigation Engineering,2015

5. Peck formula for applicability analysis of ground deformation prediction in Tunnel construction in China;X. Han;Rock and Soil Mechanics,2007

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3