Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation

Author:

Yuan Zhenmin12ORCID,Qiao Yaning12,Guo Yaru1,Wang Yaowu3,Chen Chen4,Wang Wenshun12ORCID

Affiliation:

1. School of Mechanics and Civil Engineering, China University of Mining and Technology, Xuzhou 221116, China

2. Research Center for Digitalized Construction and Knowledge Engineering, China University of Mining and Technology, Xuzhou 221116, China

3. School of Civil Engineering, Harbin Institute of Technology, Harbin 150001, China

4. Nantong Prefabricated Buildings and Intelligent Structures Institute, Nantong 226000, China

Abstract

Component factories are experiencing the problems associated with lean production, especially the accuracy of production time prediction and the unnecessary waste in terms of time and resource utilization. In order to solve these problems, a discrete event simulation- (DES-) based lean planning and optimization method for precast component production is proposed by integrating the complexity assessment (CS), discrete event simulation (DES), and lean management (LM). The method includes three submodels: improved production planning, DES, and lean analysis and optimization. In the submodel of improved production planning, a complexity evaluation index system for precast components is established through investigating five component factories, consulting seven domain experts and analysing relevant literature. In the submodel of DES, the DES technique is adopted to simulate and analyse the production activities of precast components. The submodel of lean analysis and optimization provides multidimensional analysis, comparative analysis, and suggestions. Finally, a detailed production case is selected to simulate and test the proposed method. The important findings are as follows: (1) this method can minimize the difference between the processing time of each workstation to avoid bottleneck stations as much as possible; (2) this method can capture the uncertainty during precast component production, and the most likely production time calculated by the method is 12.05 hours instead of the 11.50 hours originally estimated by the component factory; (3) this method can identify some unnecessary waste in the production process of precast components, including less than 50% utilization of workstations and unnecessary equipment purchases; (4) this method also provides some suggestions regarding production optimization. Due to the particularity of precast component production, it further expands the boundary of lean production methodology from the perspective of the construction industry rather than the manufacturing industry. The proposed method assists component factories in planning and optimizing the precast component production when they make detailed production plans.

Funder

Fundamental Research Funds for the Central Universities

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Cited by 16 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3