Case Study and Numerical Simulation of Excavation beneath Existing Buildings

Author:

Shan Hua-feng123ORCID,He Shao-heng2,Lu Yu-hua3,Jiang Wei-jian3

Affiliation:

1. School of Civil Engineering and Architecture, Taizhou University, Taizhou 318000, China

2. Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China

3. Fangyuan Construction Group Co., Ltd., Taizhou 318000, China

Abstract

Excavation beneath existing buildings may cause the superstructure to tilt and crack, which seriously affects the normal use of the superstructure. Due to the new working conditions of excavation beneath existing buildings, related case reports are rare and limited. In the case of No. 3 section basement construction project of Ganshuixiang, we monitored the excavation construction by burying test instruments at the designated location. Afterwards, Plaxis 3D finite element software was used to establish an underpinning pile-cap-excavation model, which can analyze the influence of different pile cutting sequences on the bearing behavior of new basement structural pillars. By comparing the in situ measurement data with the finite element model, it can be concluded that when the excavation depth rises, the axial force of the underpinning pile gradually increases, and the pile skin friction is slowly exerted from top to bottom. Different cutting sequences will influence the bearing behavior of the structural pillar. Moreover, the pile cutting process also significantly impacts its bearing behavior and the settlement behavior of the superstructure. Compared with the clockwise pile cutting sequence, the symmetrical pile cutting is more advantageous. In the whole process of the storey adding and reconstruction, the superstructure settlement is related to the working condition of digging and adding layers. In the stage from soil excavation to the concrete curing period of the structural pillar, it increases slowly with time and tends to be stable in the concrete curing period. However, in the pile cutting stage, the superstructure settlement increases sharply, and after pile cutting, it becomes stable.

Funder

Natural Science Foundation of Zhejiang Province

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3