Study on Identifying Significant Risk Sources during Bridge Construction Based on Grey Entropy Correlation Analysis Method

Author:

Wang Kunpeng1,Lu Chenggang1,Li Qingfu2ORCID

Affiliation:

1. Powerchina Roadbridge Group Co, Ltd., Beijing 100048, China

2. School of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, China

Abstract

Nowadays, many methods have been used in the identification of bridge risk sources, and certain results have been achieved. However, the research on the identification of significant risk sources of bridges during the construction period is relatively weak, and these methods still have some defects, such as the correlation between risk sources is not considered comprehensively, the dynamic risk sources are not fully considered, and the weight assignment is highly subjective. In order to solve these problems, this paper comprehensively uses the combination of expert scoring method, fuzzy analytic hierarchy process (F-AHP), and grey entropy correlation analysis (GECA) to identify significant risk sources during bridge construction. Firstly, the F-AHP and expert scoring method are used to initially identify safety sources during the bridge construction period, which effectively considers the identification of dynamic risk sources. Secondly, the combination of the GRA method and EW method is applied to identify the significant risk sources during bridge construction period, which can effectively analyze the interrelationship between different factors and greatly reduce the interference of subjective factors in the weight assignment, so as to effectively control the risks in construction and protect the health of the bridge structure and property losses. Finally, the feasibility and rationality of the proposed method were verified by comparing the AHP and GECA proposed in this paper in combination with specific engineering examples, which provides a reference basis for the identification of significant risk sources during the follow-up bridge construction period.

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Reference40 articles.

1. The risk assessment and management of bridge construction;L. Wang;Journal of Chengdu Technological University,2016

2. Risk matrix for factors affecting time delay in road construction projects: owners' perspective

3. “Risk identification in the early design stage using thermal simulations—a case study;S. Seyed;Sustainability,2018

4. A method for identifying operation safety risk source of rocky high slope;Z. G. Wu;Journal of Highway and Transportation Research and Development,2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3