Affiliation:
1. Missouri University of Science and Technology, Rolla, USA
2. Halliburton Company, Houston, USA
Abstract
Lost circulation has become one of the biggest challenges that drilling engineering faces during drilling, especially at high-temperature reservoirs. The consequences of lost circulation can vary from an economic aspect as well as a safety aspect. In this paper, the capability of a novel high-temperature recrosslinkable preformed particle gel (HT-RPPG) is evaluated to see whether it can be better used to control severe and total losses. The HT-RPPG is injected in the form of dispersed swellable gel particles, but it can self-crosslink to form a strong bulk gel after being placed in target zones. The sealing pressure and plugging efficiency of the HT-RPPG were evaluated utilizing a core flooding test. Various impacting factors were investigated, including the swelling ratios, fracture widths, and bentonite concentrations. Results indicated that HT-RPPG is an excellent material that can be used to control the severe loss of drilling fluids in fractured reservoirs with temperatures up to 130°C. The recrosslinked RPPG could withstand pressure up to 1,077 psi/ft for fractures up to 2 mm, and permeability was reduced more than 107 times.
Reference28 articles.
1. Stabilizing the wellbore to prevent lost circulation;J. Cook;Oilfield Review,2011
2. Wellbore stability, stabilization and strengthening;F. B. Growcock
3. Lost circulation control and wellbore strengthening: looking beyond particle size distribution;A. Kumar