Evaluation of the Total Quality of Tunnel Contour Using Projection Pursuit Dynamic Cluster Method

Author:

Zou Baoping123ORCID,Xu Zhipeng4ORCID,Wang Jianxiu2ORCID,Luo Zhanyou1ORCID,Hu Lisheng5ORCID

Affiliation:

1. School of Civil Engineering and Architecture, Zhejiang University of Science and Technology, Hangzhou 310023, China

2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China

3. State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Beijing 100083, China

4. College of Water Resource and Hydropower, Sichuan University, Chengdu 610065, China

5. China Railway No. 2 Engineering Group Co., Ltd., Chengdu 610031, China

Abstract

Full understanding of the total quality of tunnel contour after smooth blasting is quite a valuable task for accurately assessing the cost and construction rate. The traditional evaluation of tunnel contour quality which is always based on a single index such as the over/underbreak might not be rational enough because the contour quality at specific positions cannot completely stand for that of the total contour. Unreasonable evaluation of contour quality might cause construction delay or overbudget, as well as safety- and stability-related issues or even catastrophic accidents under some specific conditions. In this case, evaluating the total quality of tunnel contour considering all influential factors is of significance to smooth tunnelling. The aim of this paper is to develop a multiple indices system which can represent the total quality of the contour from different aspects, and then, the projection pursuit dynamic cluster (PPDC) method is utilized to quantitatively evaluate the total quality of tunnel contour. The multiple indices are screened using the principal component analysis (PCA) and gray correlation analysis (GCA). The selected 9 indices to form the multiple indices system include the maximum overbreak, average overbreak, maximum underbreak, maximum size of step between two guns, area of overbreak, measured area, rate of overbreak, volume of overbreak, and blast hole utilization factor. The total quality of tunnel contour is quantitatively defined with 5 levels by using the dynamic cluster (DC) analysis. With the obtained values of the 9 indices, the total quality of the tunnel contour could be determined quantitatively according to the calculated projection eigenvalues. The result of the total quality of tunnel contour obtained using the proposed method is much more accordant with the site than that based on a single evaluation index. The proposed method will offer a promising alternative to fully understand the total quality of tunnel contour.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3