Affiliation:
1. School of Traffic and Transportation Engineering, Central South University, Changsha 410075, China
2. Information Department, Lanzhou Railway Administration, Lanzhou 730050, China
Abstract
Dispatchers often set noncrossing block sections (NCBSs) for railway out-of-gauge train (OGT) running on double-track railway line for safety reasons. In this paper, we will investigate the best location, length, and number of noncrossing block sections to reduce railway capacity loss due to the operation of OGTs. Firstly, yielding, overtaking, stopping, starting, and other operation rules for OGTs running on double-track railway line were designed, and a simulation model based on cellular automata was further put forward. Then, an assessment model for double-track railway line capacity loss due to the operation of OGTs was set up. Some simulation experiments and the comparisons of these results were further given to achieve the optimal setting of NCBS for OGTs running on double-track railway line. In the case of NCBSs number minus one, capacity loss caused by the operation of OGTs can be reduced up to 15.2% in the upstream direction and 6.3% in the downstream direction. Also, the NCBSs should lie at the nearest block sections (BSs) to depot stations and the NCBSs lengths should be as less as possible.
Funder
National Natural Science Foundation of China
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献