Shield Cutting Pile-Group Implementation Effects on the Superstructure

Author:

Zhang Chi1,Ma Shiju2ORCID,Guo Yuancheng1,Li Mingyu1,Fu Kui3

Affiliation:

1. School of Civil Engineering, Zhengzhou University, Zhengzhou, China

2. School of Civil Engineering, Zhengzhou Institute of Technology, Zhengzhou, China

3. China Railway 18th Bureau Group First Engineering Co. LTD, Baoding, Hebei, China

Abstract

The shield tunneling method is widely used in urban subway construction. However, as the layer stress state changes during shield tunnel construction, layer displacement and surface deformation occur accordingly. This study tries to investigate the settlement and deformation of the masonry structure in shield cutting the composite foundation of group piles in a shield tunnel project at Zhengzhou Metro Line 5. To understand the distribution characteristics and changing rules of building settlement during the process of shield cutting group piles composite foundation passing through the masonry structure, a thorough analysis of the ground surface settlement and building settlement, including on-site measured, was conducted. The results show that piles go down through a composite foundation during shield cutting. The cumulative maximum settlement and maximum differential settlement of the masonry structure were concentrated at the intersection of the tunnel axis and the building. The longitudinal distribution of the cumulative settlement of the south and north wall of the masonry structure changes continuously with the change of the position of the shield excavation surface. That behavior may cause the building to be tilted and deformed and cause the structure to undergo rigid rotation and twisting deformation. Based on the composite pile foundation project of the Shield Tunnel Cutting Group in a specific section of Zhengzhou Metro Line 5, this paper analyzes the surface settlement and foundation settlement data of the building caused by the construction of the shield. It obtains the changes of the surface settlement and the settlement of the foundation of the building. No other changes have been made to the existing cracks in the external walls of the building. At the same time, because of the low angle between the longitudinal axis of the masonry structure and the tunnel axis (22°) and the positive effect of the ring beam and column of the structure in the building, it is clear that the construction of this project has little effect on the upper building, thus showing improved control.

Funder

China Railway

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference23 articles.

1. Settlement of buildings and associated damage;J. B. Burland

2. Behaviour of foundations and structures;J. B. Burland

3. Building Response to Excavation‐Induced Settlement

4. Ground-Movement-Related Building Damage

5. Assessment of risk of damage to buildings due to tunnelling and excavatioins;J. Burland

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3