Affiliation:
1. Centre for Construction Innovation, Department of Construction Engineering and Management, Faculty of Civil Engineering, National Technical University of Athens, Athens 15570, Greece
Abstract
Cost-benefit analysis (CBA) is very useful when appraising engineering projects and examining their long-term financial and social sustainability. However, the inherent uncertainty in the estimation of completion time, final costs, and the realization of benefits often act as an impediment to its application. Since the emergence of fuzzy set theory, there have been significant developments in uncertainty modelling in project evaluation and investment analysis, primarily in the area of formulating a fuzzy version of CBA. In this context, in studying the key indicators of CBA, whereas fuzzy net present value (fNPV) has been investigated quite extensively, there are significant issues in the calculation of fuzzy internal rate of return (fIRR) that have not been addressed. Hence, this paper presents a new conceptual model for studying and calculating fNPV and fIRR. Three-dimensional fNPV and fIRR graphs are introduced as a means of visualizing uncertainty. A new approach is presented for the precise calculation of fIRR. To facilitate practical application, a computerization process is also presented. Additionally, the proposed methodology is exemplified in a sample motorway project whereby its advantages over traditional stochastic uncertainty modelling techniques such as Monte Carlo analysis are discussed. Overall, it is concluded that the new approach is very promising for modelling uncertainty during project evaluation for both project managers and project stakeholders.
Subject
Civil and Structural Engineering
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献