Affiliation:
1. School of Mathematics and Physics, Suzhou University of Science and Technology, Suzhou 215009, China
Abstract
In this paper, we consider a time-dependent risk model with a Brownian perturbation. In this model, there is a dependence structure between the claim sizes and their corresponding interarrival times. Assuming the claim sizes have subexponential distributions, we obtain the asymptotic lower bound of the finite-time ruin probability. When the claim sizes have distributions from the class L∩D, the asymptotic upper bound of the finite-time ruin probability has been presented. These results confirm that when the claim sizes are heavy-tailed, the asymptotics of the finite-time ruin probability of this time-dependent model are insensitive to the Brownian perturbation.
Funder
National Natural Science Foundation of China
Subject
General Engineering,General Mathematics
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献