Affiliation:
1. Business School, University of Shanghai for Science and Technology, Shanghai 200093, China
2. Henan Institute of Technology, Xinxiang, Henan 453000, China
Abstract
This paper proposes a two-stage joint optimization problem of green manufacturing and maintenance for semiconductor wafer (TSGMM-SW) considering manufacturing stage, inspection, and repair stage simultaneously, which is a typical NP-hard problem with practical research significance and value. Aiming at this problem, a green scheduling model with the objective of minimizing makespan, total carbon emissions, and total preventive maintenance (PM) costs is constructed, and an improved hybrid multiobjective multiverse optimization (IHMMVO) algorithm is proposed in this paper. The joint optimization of green manufacturing and maintenance is realized by designing synchronous scheduling and maintenance strategy for wafer manufacturing and equipment PM. The diversity of the population is expanded and the optimization performance of IHMMVO is improved by designing the initial population fusion strategy and subpopulation evolution strategy. In the experimental phase, we perform the simulation experiments of 900 test cases randomly generated from 90 parameter combinations. The IHMMVO algorithm is compared with other existing algorithms to verify the effectiveness and feasibility for TSGMM-SW.
Funder
National Natural Science Foundation of China
Subject
General Engineering,General Mathematics
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献