Causes of Delay in the Construction Projects of Subway Tunnel

Author:

Zhang Dingbang1ORCID,Zhang Hang2,Cheng Tao1

Affiliation:

1. School of Civil Engineering, Hubei Polytechnic University, Huangshi 435003, China

2. South Engineering Co., Ltd., Chinese Railway Bridge Engineering Bureau Group Company, Guangzhou 510000, China

Abstract

The constructions of urban infrastructure are an important sector that provides remarkable ingredients for the economic development of modern cities. However, a large number of transportation infrastructure construction projects are delayed; therefore, those projects always exceed their original time and cost estimates. So construction delay has been considered as a recurring problem in the construction projects of urban infrastructure, and it adversely affects the time, cost, safety, and quality of construction. This paper is committed to investigating the time performance of subway tunnel constructions in China to identify the causes of delay based on the questionnaire surveys of 87 tunnel consultants and 91 contractors, and a total of 49 delay causes of tunnel construction are identified one by one in this study. It can be concluded from this study that the six most severe delay causes are national policy for subway tunnel construction, complicated geological conditions, payment delays by owners, award projects to the lowest bid price, shortage of advanced large equipment, and low productivity of laborers. There is a relatively reliable agreement between the tunnel consultants and contractors of 76.3% on the ranking of different delay causes.

Funder

Key Project of Research Center for Mining & Metallurgy Culture and Economic & Social Development in the Middle Reaches of the Yangtze River

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference25 articles.

1. Causes of contractor’s business failure in developing countries: the case of Palestine;A. Enshassi;Journal of Construction in Developing Countries,2006

2. Delays in construction: a brief study of the Florida construction industry;S. Ahmed

3. Cost escalation and schedule delays in road construction projects in Zambia

4. NegaF.Causes and effects of cost overrun on public building construction projects in Ethiopia2008Addis Ababa, EthiopiaAddis Ababa Univ.MS thesis

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3