Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System

Author:

Car-Pusic Diana1ORCID,Petruseva Silvana2ORCID,Zileska Pancovska Valentina2ORCID,Zafirovski Zlatko2ORCID

Affiliation:

1. Faculty of Civil Engineering, University of Rijeka, Rijeka 51000, Croatia

2. Faculty of Civil Engineering, University “Ss. Cyril and Methodius”, Skopje 1000, North Macedonia

Abstract

A model for early construction cost prediction is useful for all construction project participants. This paper presents a combination of process-based and data-driven model for construction cost prediction in early project phases. Bromilow’s “time-cost” model is used as process-based model and general regression neural network (GRNN) as data-driven model. GRNN gave the most accurate prediction among three prediction models using neural networks which were applied, with the mean absolute percentage error (MAPE) of about 0.73% and the coefficient of determination R2 of 99.55%. The correlation coefficient between the predicted and the actual values is 0.998. The model is designed as an integral part of the cost predicting system (CPS), whose role is to estimate project costs in the early stages. The obtained results are used as Cost Model (CM) input being both part of the Decision Support System (DSS) and part of the wider Building Management Information System (BMIS). The model can be useful for all project participants to predict construction cost in early project stage, especially in the phases of bidding and contracting when many factors, which can determine the construction project implementation, are yet unknown.

Funder

University of Rijeka

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference51 articles.

1. Neural networks for modelling the final target cost of water projects;D. Ahiaga-Dagbui

2. Contracted price overrun as contracted construction time overrun function;V. Žujo;Tehnički Vjesnik : Znanstveno-Stručni Časopis Tehničkih Fakulteta Sveučilišta U Osijeku,2010

3. Underestimating Costs in Public Works Projects:Error or Lie?

4. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries

5. Construction cost prediction model for conventional and sustainable college buildings in North America

Cited by 9 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3