Abstract
In hard cataclastic surrounding rock with high geostress, the rock monomer strength is high and the rock is broken, and tunnel excavation in it is apt to cause large deformation, collapsing, and breaking, causing initial support crack and even intruding of the initial support deformation. The characteristics of the support system under different support parameters and shapes are analyzed, and the reasonable support section shape and support parameters are determined. The results showed that (1) under the condition of high geostress and hard cataclastic surrounding rock, the initial support deformation is large, the horizontal convergence is much larger than the settlement of arch, and the deformation duration is relatively short; (2) the distribution of pressure and stress in initial support are very uneven on the cross-section and greatly affected by the construction process; (3) in the case of large horizontal tectonic stress, the use of large curvature side wall support is beneficial to improve the quality of support and control the deformation of the structure, especially to improve the stress of concrete; (4) the closure time of the supporting system greatly influences the stress state and deformation, so it is necessary to shorten the length of the lower bench and the distance of the invert as possible so as to close the support as early as possible; (5) different location of the tunnel surrounding rock stress distribution is very uneven, the measured value is much larger than calculated value in level III based on the specification of surrounding rock; (6) under high strength and ground stress, the initial supporting stress of steel frame increases rapidly, and the measured stress is larger. This indicates that the steel frame structure bears heavy early load. Therefore, the stiffness of the steel frame should be as large as possible to meet the loading requirements.
Funder
National Natural Science Foundation of China
Subject
Mechanical Engineering,Mechanics of Materials,Geotechnical Engineering and Engineering Geology,Condensed Matter Physics,Civil and Structural Engineering
Reference17 articles.
1. Analysis on the characteristics and development trends of the support technology of high ground stress tunnels in China Modern;B. Wang;Tunnelling Technology,2018
2. Analysis of the deformation and mechanical characteristics of the surrounding rock-Lining structure of the Muzhailing tunnel;M. Huang;Modern Tunnelling Technology,2016
3. Experimental study on primary lining form of tunnels in phyllite on Chengdu-Lanzhou railway;L. I. Lei;China Civil Engineering Journal,2018
4. Experimental research on the reasonable support scheme of soft rock tunnel with high ground stress;X. Cao;Journal of Railway Engineering Society,2018
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献