Dynamic Probability Analysis for Construction Schedule Using Subset Simulation

Author:

Zhang Shen1ORCID,Wang Xingyu1ORCID

Affiliation:

1. Central-South Architectural Design Institute Co., Ltd., Wuhan 430071, China

Abstract

Schedule management is an essential part of construction project management. In practical management affairs, many uncertainties may lead to potential project delays and make the schedule risky. To quantify such risk, the Probabilistic Critical Path Method (PCPM) is used to compute the overdue probability. Survey shows it could help project managers understand the schedule better. However, two critical factors limited the application of PCPM: computational efficiency and timeliness. To solve these constraints, we combined subset simulation and statistical learning to build a computationally efficient and dynamic simulation system. Numerical experiment shows that this method can effectively improve the computation efficiency without losing any accuracy and outperforms the other approaches with the same assumptions. Besides, we proposed a machine learning-based way to estimate task duration distributions in PCPM automatically. It collects real-time progress data through user interactions and learns the best PERT-Beta parameters based on these historical data. Our estimator provides our simulation system the ability to handle dynamic assessment without laborious human work. These improvements reduce the limitations of PCPM, making the application of PCPM in practical management affairs possible.

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3