Aiming at the problems of safety and monitoring beyond the existing experience in the construction of the subway stations with arch cover method in Dalian, China, combined with the real-time monitoring requirements of intelligent construction status, a multi-information construction monitoring system based on digital twin(DT) and Internet of Things(IoT) is proposed, and the digital twin 3D architecture is established. First, on the basis of the IoT monitoring experience of tunnel, the installation plan of the automatic monitoring device of the arch cover method subway station is clarified, and the sensor arrangement is carried out. Then, based on the Revit platform, the establishment of the main structure model of the station and the BIM parametric modeling technology of the sensors are realized, and the monitoring properties of the sensors are expanded. Finally, through the design of the BIM database and in the form of secondary development, a BIM-based construction information visualization monitoring system is established to realize the correlation between the sensor model and the monitoring data and achieve the effect of information visualization query and color change early warning. The system was initially applied at Shikui Road Station of Dalian Metro Line 5 and achieved good results. The system can intuitively reproduce and accurately describe the subway station construction status, which provides an advanced technical means for the informatization and visualization management of the construction of arch cover method subway stations.
Funder
Liaoning Revitalization Talents Program
Subject
Electrical and Electronic Engineering,Instrumentation,Control and Systems Engineering
Reference44 articles.
1. Environmental impact analysis for the construction of subway stations: Comparison between open-excavation and underground-excavation scheme
2. Energy consumption of subway stations in China: Data and influencing factors
3. Study of model tests on large-span tunnel’s damage caused by overload with arch cover method;Z. Q. Ji;Advanced Materials Research,2014
4. Study on adaptability of primary support arch cover method for large-span embedded tunnels in the upper-soft lower-hard stratum;J. Wang;Advances in Mechanical Engineering,2019
5. Effect of excavation blasting in the arch cover method on adjacent existing pipelines in a subway station;X. Liu;Applied Sciences,2022
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献