Research on Construction Methods for Ultralarge Y-Shaped Tunnel Sections

Author:

Cao Shiding1ORCID,Xie Yongli1,Tang Wei1,Wang Wei2,Zhou Qianru1,Guo Aipeng3ORCID

Affiliation:

1. Shenzhen Transportation Degish & Research Institute Co., Ltd., Shenzhen 518003, China

2. Building & Materials Industry Management Office of Minhang District, Shanghai 201100, China

3. State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology (Beijing), Beijing 100083, China

Abstract

Many problems are encountered in the construction of bifurcated tunnels due the abrupt change in section, small clear distance, and large section. Progress in the direction of tunnel construction is limited by the large-span section; therefore, a special method of construction that involves constructing a guiding tunnel first followed by reverse excavation was adopted to construct the large-span bifurcation section of the Liantang tunnel of Shenzhen Eastern Transit Expressway in China. The stability criterion of the surrounding rock of the middle wall in the section of multiple arch and small clear distance is studied by theoretical analysis, and the internal stress and corresponding ultimate strength of the middle wall under different buried depths and widths of the middle wall are calculated by the stability criterion. In this study, 3D finite-difference software was used to simulate the excavation process under forward and reverse excavation conditions. The results show that the displacement field and internal force field distribution are similar for both excavation methods, and the tunneling first and reverse excavation construction method is safe and reliable.

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Reference21 articles.

1. Study on structural optimization of transition section of bell mouth bifurcation tunnel;X. L. Li;Value Engineering,2020

2. Structure and type selection of large span bifurcated tunnel of Underground Road Interchange in urban core area;S. Z. Wu;Highway Traffic Technology,2018

3. Research on key technology of bidirectional construction of large span small clear distance bifurcated tunnel;Y. P. Hu;Railway Construction Technology,2018

4. Study on construction method of bifurcated section of long span bifurcated tunnel;D. M. Cai;Highway Tunnel,2015

5. Research on key technologies for structural design of long span bifurcated tunnel;Q. Bi;Tunnel Construction,2011

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3