Large Ring Test for Evaluation of Restrained Shrinkage Cracking: Calibration and Experimental Trial

Author:

Xu Zhongyu1ORCID,Hanžič Lucija2ORCID,Asche Harry13ORCID,Karlovšek Jurij1ORCID

Affiliation:

1. School of Civil Engineering, The University of Queensland, Building 49 Staff House Road, Street Lucia, Brisbane, QLD, Australia

2. Slovenian National Building and Civil Engineering Institute (ZAG), Dimičeva ulica 12, 1000 Ljubljana, EU, Slovenia

3. Aurecon, 25 King Street, Bowen Hills, QLD, Australia

Abstract

The durability of shotcrete tunnel linings is significantly affected by restrained shrinkage cracking. Given the unique characteristics of shotcrete applied in tunnel linings, especially when dealing with accelerated shotcrete containing reinforcement fibres, it is necessary to upscale the ring test commonly used. This paper presents a comprehensive experiment using large ring tests with cast concrete to investigate the impact of upscaling ring test geometry. The two ring specimens demonstrated comparable cracking age (22 days) and strain measured in the steel ring, suggesting that consistent results can be obtained through the proposed instrumentation, calibration, and correction methods. Moreover, the estimated induced tensile stresses of the concrete rings (2.8 and 2.7 MPa) are slightly lower than the predicted tensile strength (3.3 MPa) at the age of cracking, which indicates that some driving forces contributing to restrained shrinkage cracking were not indicated in the strain gauge readings. Furthermore, the study identified multi-crack formation and additional potential causes for crack initiation, which include self-restraint due to the moisture gradient in the vertical direction, deflection of the concrete ring caused by its self-weight, and friction on the contact surface of the support. Therefore, optimising the geometry of the ring specimens and the apparatus is imperative to minimise additional driving forces and unmeasurable restraints for crack initiation, especially when employing the stress rate method to assess cracking potential.

Funder

Australian Government Research Training Program

Publisher

Hindawi Limited

Reference70 articles.

1. Infrastructure pipeline by project location;Infrastructure Pipeline,2023

2. Suburban rail loop;Victoria’s Big Build,2023

3. North east link program;Victoria’s Big Build,2023

4. Western harbour tunnel;NSW Government,2023

5. Coffs harbour bypass;NSW Government,2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3