Group Scheduling with General Autonomous and Induced Learning Effect

Author:

Huo Jia-zhen1,Ning Lei1ORCID,Sun Li2

Affiliation:

1. School of Economics and Management, Tongji University, Shanghai 200070, China

2. School of Business, Shanghai Dianji University, Shanghai 201306, China

Abstract

In recent research, induced learning requires management involvement. The initial investment can be interpreted as induced learning via an investment in the creation of technological knowledge or knowledge transfer. Induced learning has received attention in productivity improvement. In this paper, we consider scheduling problems with autonomous and induced learning under group technology. The jobs’ processing times decrease according to a learning rate which conversely increases the investment cost. The objectives of the scheduling problems are to minimize a linear combination of the makespan and the investment cost and a linear combination of the total completion time and the investment cost. We present polynomial algorithms to determine the optimal job sequence, group sequence, and the percentage reduction of the standard learning rate.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

General Engineering,General Mathematics

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3