Construction and Analysis of Green Investment Risk Evaluation Index System Based on Information Entropy Fuzzy Hierarchical Analysis Model

Author:

Huang Yuqi1ORCID

Affiliation:

1. Shaoxing University Yuanpei College, Shaoxing 312000, China

Abstract

This paper adopts the information entropy fuzzy hierarchical analysis model to conduct an in-depth study and analysis of the green investment risk evaluation system and to process and analyze its indicators. The entropy method-fuzzy hierarchical analysis is used to evaluate the green financial capital operation risk. Firstly, I point out the research trends and shortcomings, define the concepts of fund operation, operation risk, risk evaluation, and green finance, and elaborate the relevant basic theories to lay the theoretical foundation for the later research; secondly, I identify the external and internal fund operation risks by describing the development plan, overall operation, and specific operation plan of green finance; then, according to the existing fund operation risks, I integrate commercial banks’ risk. Then, based on the existing fund operation risks, I integrate the risk types of commercial banks, combine the characteristics of green finance business, design the green finance fund operation risk evaluation index system, initially determine the index weights through hierarchical analysis method, introduce the entropy value method to improve the index weights, and use the fuzzy comprehensive evaluation method to obtain the final evaluation results: in the process of green finance fund operation, internal risk is the most important risk, among which credit risk and financial innovation risk have the most significant impact; external risk is the second most important risk, among which economic risk and political risk are the most important. External risks are the second most important risks, among which economic risks and political risks are more obvious. The risks are judged from single-factor aspects, and the scoring values are used to determine the higher possibility of schedule risks caused by human factors, and finally, the schedule risk level of the reservoir project is determined to be medium through a comprehensive evaluation. The reasonableness of the calculation results shows that the entropy theory and the fuzzy comprehensive evaluation method are still applicable to the assessment of green investment risks.

Publisher

Hindawi Limited

Subject

Electrical and Electronic Engineering,Computer Networks and Communications,Information Systems

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3