System Hazard Analysis of Tower Crane in Different Phases on Construction Site

Author:

Jiang Ling1ORCID,Zhao Tingsheng1ORCID,Zhang Wei1,Hu Junjie1

Affiliation:

1. School of Civil Engineering & Mechanics, Huazhong University of Science and Technology, Wuhan, Hubei 430074, China

Abstract

Tower crane accidents frequently occur in the construction industry, often resulting in casualties. The utilization of tower cranes involves multiple phases including installation, usage, climbing, and dismantling. Moreover, the hazards associated with the use of tower cranes can change and be propagated during phase alternation. However, past studies have paid less attention to the differences and hazard propagations between phases. In this research, these hazards are investigated during different construction phases. The propagation of hazards between phases is analyzed to develop appropriate safety management protocols according to each specific phase. Finally, measures are suggested to avoid an adverse impact between the phases. A combined method is also proposed to identify hazard propagation, which serves as a reference and contributes to safety management and accident prevention during different tower crane phases in the construction process.

Funder

National Key R & D Program of China

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3